Killing a hill station: The government’s way

GUEST COLUMN
Rakesh Kapoor
Mussoorie is not dying by accident. It is being systematically suffocated—road by road, tunnel by tunnel and project by project—under the banner of “connectivity” and “development”.
Once envisioned as a fragile Himalayan retreat, Mussoorie is today being converted into a traffic terminal in the mountain. Mussoorie’s crisis is not the result of neglect. It is the outcome of over-attention—a relentless push for road-led development in a landscape that is geologically fragile and ecologically finite.
Over the last two decades, it has been subjected to continuous road widening, realignments, feeder roads and tourism-oriented infrastructure. Today, despite existing connectivity from Dehradun, Dhanaulti, Chakrata and the Yamuna valley, the State is pushing for a 26-kilometre elevated corridor costing Rs 6,350 crore, followed by a 42-kilometre tunnel-based access road. Besides this 26-kilometre Rispana-Bindal Elevated Corridor (RBEC) at a whopping cost of Rs 6,350 crore, a new 42-kilometre two-lane road having two tunnels of 2.9 kilometres and 2.1 kilometres at a cost of Rs 3,500 crore is being spearheaded for unknown reasons. Whereas the ordinary distance between Dehradun and Mussoorie is about 35 kilometres, a 42-kilometre route to cover the same distance sounds illogical and that too when a Rs 310 crore ropeway project is also in the offing.
The stated objectives are decongestion, safety and tourism promotion. The underlying assumption is familiar—and flawed: that more road capacity will solve a problem created by excessive road access.
What the data already tells us
Multiple national institutions have repeatedly warned against this approach. The National Disaster Management Authority (NDMA) identifies Uttarakhand as one of India’s most landslide-prone States, noting that road construction and slope cutting are among the primary anthropogenic triggers. The Wadia Institute of Himalayan Geology in Dehradun has consistently highlighted that the Mussoorie–Lesser Himalaya belt lies in a zone of high seismicity and active mass wasting, where tunnelling and elevated structures significantly raise slope-failure risk. Further, a Comptroller and Auditor General of India (CAG) performance audit on hill roads (Himalayan States) flagged poor geological investigations, cost overruns and recurring slope instability as systemic issues—not exceptions.
Yet, none of the publicly available project documents for the proposed corridors place a carrying-capacity threshold at the centre of planning.
Roads create traffic—they don’t contain it
Urban transport research globally confirms what hill towns experience on the ground- increased road capacity induces traffic. Examples are already visible in India. In neighbouring Himachal Pradesh, Shimla’s vehicle numbers multiplied several times after road expansions, while average travel speed fell. Here in Uttarakhand, Nainital’s lake catchment now routinely exceeds its tourist-holding capacity, triggering seasonal water crises. Mussoorie is heading down the same path, with added risks. Chronic water shortages despite rising hotel capacity, buildings developing structural cracks on subsiding slopes, annual monsoon landslides disrupting connectivity, winter tourism declining as snowfall becomes erratic, a trend linked to warming in the western Himalaya (as noted by IPCC regional assessments) are some of the factors which need to be considered
A Rs 6,350 crore question: Large infrastructure in fragile mountains is not value-neutral
For the cost of one elevated corridor, the State could upgrade public transport using electric shuttle systems besides enforcing strict hotel and second-home caps, invest in slope stabilisation of existing roads, restore local water sources and springsheds. Instead, high-speed access is prioritised—benefiting primarily real estate expansion and destination tourism, not residents. As environmentalist Anil Agarwal once warned, “In the mountains, every intervention multiplies its impact downstream”. Roads in hill towns are not just transport projects; they are land-use decisions in disguise.
The missing question
The debate is framed around how quickly Mussoorie can be reached from the plains. The real policy question is how much Mussoorie can endure. Without enforceable carrying-capacity norms, transparent geological risk assessments and independent monitoring, new roads will not decongest Mussoorie—they will complete its transformation into a traffic-locked urban extension of the plains. Mussoorie will remain on the map.Whether it remains a hill station—or becomes a cautionary tale—is a choice that is still the governments’ own.
(A former secretary to the Himachal Pradesh government, the author is an environmental expert & policy analyst; views expressed are personal)


